African gold and copper production line

  • Ahroughput:45 t/h
  • Material:Gold and Copper Mine
TEL: +86 17398956111 Consulting service

Project introduction

The African gold and copper mine project undertaken by Henan Shunzhi includes beneficiation test, mine design, equipment manufacturing and procurement, packaging and shipping, installation and commissioning, and worker training.

9-9.png

Crushing stage

Use a jaw crusher crushing process

Grinding and grading stage

A closed-circuit grinding process using a ball mill.

beneficiation stage

The sorting system uses a coarse flotation process with three sweeps and three fines.

Concentrate/tailings dewatering stage

The concentrate dewatering system adopts filter press dewatering. After the flotation tailings are concentrated, the bottom of the cyclone flows through the vibrating screen for dehydration; the overflow of the cyclone flows to the concentrator for concentration, and then the vacuum disc filter is used for filtration and dehydration.

Process Flow

Raw ore is sent to jaw crusher via vibrating feeder for coarse crushing.

The materials crushed by the jaw crusher are then sent to the ball mill for grinding.

Qualified ore powder after grinding operation is sorted by spiral classifier.

The pulp sorted by the spiral classifier enters the flotation machine, and the pulp processed by the flotation machine enters the dehydrator for dehydration.

Site Atlas

MORE>>CASE

Guinea Gold Mineral Processing Line

Processing materialsGold ore
Ahroughput150 t/h
Processing EquipmentCrusher,Ball mill,Flotation machine,Hydrocyclone
Consult the project

Iran tungsten ore processing line

Processing materialsTungsten
Ahroughput60 t/h
Processing EquipmentCrusher,Ball mill,Magnetic separator,Shaking table
Consult the project

Chile molybdenum production line

Processing materialsMolybdenum Ore
Ahroughput150 t/h
Processing EquipmentCrusher,Ball mill,Flotation machine,Spiral classifier
Consult the project

African gold and copper production line

Processing materialsGold and Copper Mine
Ahroughput45 t/h
Processing EquipmentCrusher,Ball mill,Flotation machine,Spiral classifier
Consult the project

Technological innovation              Quality oriented

Online and offline communication

Online and offline communication

 Confirmation of customer needs

Confirmation of customer needs

 Tailored

Tailored

  Professional delivery team

Professional delivery team

Customer acceptance

Customer acceptance

Comprehensive after-sales

Comprehensive after-sales